MISSION-CRITICAL

Mission-critical environments: data centers, labs, and cleanrooms

Redundant cooling for data centers, telecom infrastructure, laboratories, and cleanrooms — across Canada. Engineered for the operations teams whose downtime cost is measured in minutes, not hours.

Trusted by

Kolostat partners with Canadian data center, colocation, telecom-backbone, and high-tech infrastructure operators.

2,000+
Projects deliveredAcross Canada since 1927, all sectors.
25+
Service trucksDispatched 24/7 across Greater Montréal and the GTA.
300+
Certified specialistsEngineers, technologists, technicians — LEED, CEM, CMVP, RCx.

Client spotlight

One of Canada's largest data center and colocation operators.

eStruxture

A case study in mission-critical mechanical delivery — how Kolostat scoped, built, and tuned the cooling and energy plant for an eStruxture facility, without compromising uptime.

  • 24/7Uptime preserved
  • Multi-MWCooling capacity
  • Single teamEngineering + install + service
  • QuebecSite location
See our data center cooling service
Watch on YouTube ↗

What we do for mission-critical environments

Six scopes, one delivery org

Engineering, controls and installation from one accountable team, plus 24/7 service in Quebec and Ontario — the scopes operations directors usually buy from three or four vendors, run by one.

  1. High‑density cooling — CRAC, in‑row, rear‑door, liquid

    Precision air conditioning and liquid‑cooling strategies for high‑density compute and high‑thermal‑load environments — engineered for the rack densities you actually run, not catalog defaults.

  2. Redundant chilled-water and controls

    N+1 and 2N redundant designs for chilled water, distribution, and controls — engineered so a single component failure never takes the load offline.

  3. Cleanroom and laboratory environments

    Pressurization, humidity, and particle control for cleanrooms and laboratories — the tight thermal and pressure tolerances research and biotech facilities require.

  4. WebCTRL® monitoring and proactive alerts

    Real-time WebCTRL® / Automated Logic monitoring, automated alerting, and continuous performance optimization — built on the platform Kolostat is an authorized partner for.

  5. Fast-track retrofits

    Integrated design-build compresses the engineering-to-commissioning timeline so retrofits land on the operations calendar your business can actually accept.

  6. 24/7 preventive maintenance contracts

    Preventive maintenance plans for facility directors who cannot afford surprises — quarterly or biannual inspections, BMS monitoring, priority dispatch, written reports — in Quebec and Ontario.

The team behind the controls

The engineering depth a mission-critical environment requires

A mission-critical cooling plant is a controls problem as much as a mechanical one. Kolostat's engineering, controls, and energy teams operate inside the same delivery org — so the people who design the redundancy, commission the BMS, and — for clients in Quebec and Ontario — respond to a 3 a.m. alert are working from the same documentation.

  • Real-time monitoring on Automated Logic / WebCTRL® — Kolostat is an authorized partner
  • Precise control, automated alerts, and continuous performance optimization
  • Digital-twin integration where the operations cadence justifies it
  • Multidisciplinary team — engineers, control technicians, project managers, service pros
Controls and BMS optimization

Why operators choose Kolostat for mission-critical

The four levers our clients actually invest in

Operations directors, facilities VPs, and colocation ops teams shortlist on these four. Each is a sourced claim — no marketing varnish.

  • Speed without engineering shortcuts

    Integrated design-build collapses engineering, fabrication, install, and commissioning into one accountable timeline — so retrofits land inside the operations window your business can absorb.

  • Redundancy, validated by transparent audits

    N+1 / 2N redundant cooling and controls designed to protect operations 24/7 — with transparent audits behind the redundancy claim, not marketing language.

  • Around 30% energy savings on critical cooling

    Annual energy savings of roughly 30% on critical cooling systems on past mandates — validated by transparent audits and delivered without compromising uptime.

  • Specialized on-call coverage, 24/7

    A dedicated dispatch line, proactive support, and complete service management in Quebec and Ontario — for clients whose downtime cost is measured in minutes, not hours.

No-downtime methodology

How we keep your environment online during a retrofit

Working in a live mission-critical environment is a sequencing problem. The methodology below is how we plan the work so the live side is never the side being touched.

  1. Discovery against your runbook

    Site walk with a senior engineer against your existing runbook — measured against the cooling architecture, maintenance windows, and uptime SLAs you actually operate to.

  2. Redundant-side-first sequencing

    Work staged so the redundant side absorbs load first. Cutovers scheduled in coordination with your operations team — so the live side is never the side being touched.

  3. Live-environment execution

    The same discipline our crews apply to occupied office and multi-residential buildings — temporary services, off-hours invasive work, communication discipline — applied to live mission-critical environments.

  4. Commissioning with monitored handover

    Load testing, controls commissioning, and a monitored handover on Automated Logic / WebCTRL® — with proactive alerts wired into your ops cadence before the project closes.

How we work

Four steps from runbook walk-through to monitored handover

  1. Meet

    Senior-engineer site walk and discovery against your runbook. Free.

  2. Visit

    We measure existing cooling, controls, and redundancy constraints.

  3. Diagnose

    Engineering proposal with cost, schedule, and uptime sequencing plan.

  4. Build

    Phased execution, commissioning, monitored handover.

Operations-director FAQ

What our clients ask before signing on

  • How do you handle a no-downtime cooling retrofit on a live data center?

    We sequence the work so the redundant side absorbs load first, schedule cutovers in coordination with your operations team, and apply the same live-environment discipline our crews use in occupied office and multi-residential buildings — temporary services, off-hours invasive work, communication discipline. The work plan is built around your maintenance window, not ours.

  • What level of redundancy do you design to?

    We design redundant chilled-water and controls topologies that match the availability SLA the operations team has actually committed to — typically N+1 or 2N for chilled water, distribution, and controls. The redundancy claim is validated by transparent audits, not marketing language.

  • Do you handle laboratory and cleanroom mechanical scope?

    Yes. Pressurization, humidity, and particle control for cleanrooms and laboratories is a core mission-critical scope — the same precision-air-conditioning and ultra-precise air-quality engineering we deliver for data centers, applied to research, biotech, and high-tech production environments.

  • How much energy can we realistically save on critical cooling?

    On past mandates we have delivered annual energy savings of roughly 30% on critical cooling systems, without compromising uptime. The number is validated by transparent audits — we instrument the plant during commissioning and measure savings against baseline, so the figure your operations team reports is sourced from the site, not from an estimate.

  • Where do you deliver mission-critical projects?

    Across Canada. Data center, laboratory and cleanroom projects are delivered from our Laval head office and our offices in Montréal, Toronto, Newmarket and Calgary. Preventive maintenance, 24/7 dispatch and specialized on-call coverage are provided in Quebec and Ontario.

  • Do you have 24/7 dispatch for cooling failures on a data center?

    Yes, in Quebec and Ontario. One dispatch number — 514-333-7333, option 1 — backed by a fleet of 25+ service trucks across Greater Montréal and the GTA, plus specialized on-call coverage for mission-critical clients. Data centers are a core sector for our preventive-maintenance contracts and 24/7 emergency dispatch.

  • What monitoring and controls platform do you commission on?

    Real-time monitoring on Automated Logic / WebCTRL® — Kolostat is an authorized ALC / WebCTRL® partner. We commission dashboards, proactive alerts, and continuous performance optimization, with digital-twin integration where the operations cadence justifies it. The platform is technology-neutral on the equipment side and integrates with non-ALC plant.

Request a quote

Tell us about your project

Submit right here — a Kolostat engineer will follow up to scope the work. Email and phone are required.

01About you

02Your project
What kind of building?
What's the situation?