GRANT GUIDE · ENERGY DIVISION
Finance up to 75% of your next HVAC project — here's the math
A 6-page brief reporting $59M in cumulative grants secured and 55,000 t of GHG avoided annually across past client mandates, plus a four-sector appendix based on data as of June 1, 2025. The guide describes historical program support; current eligibility and funding levels must be confirmed.
- $0M
- Cumulative grants secured for clientsReported across past client mandates.
- 0 t
- GHG avoided annuallyEquivalent to roughly 15,000 cars off the road.
- 0%
- Average subsidy shareFour-sector appendix average as of June 1, 2025 — commercial, industrial, multiresidential, and horticulture.
- $0M
- Annual energy savingsTotal documented in the four-sector appendix as of June 1, 2025.
What's inside
Six pages. Four numbers that matter.
A working brief for VP-facilities, asset managers, and CFOs evaluating a building-mechanical capex. Numbers, not marketing.
The 75% math, page by page
How grants have helped finance past energy-efficiency projects — including historical dual-energy funding of up to 80% of certain project surcharges. Current eligibility and funding levels must be confirmed.
$59M in grants. 55,000 t of GHG avoided.
Cumulative results reported across past client mandates, presented separately from the dated four-sector appendix.
Subsidy share by sector
The June 1, 2025 appendix documents subsidy shares of 29% commercial, 38% industrial, 41% multiresidential, and 30% horticulture.
The Energy-division approach
Grant-optimized design, unified responsibility, lifetime warranty on maintenance — what working with Kolostat's Energy division actually looks like.
Why our Energy division
The single point of contact for design, application, and reporting
Our Energy division — Kolostat's energy and decarbonization arm — runs the full grant path. One team for the engineering, the application, the implementation, and the reporting.
Total turnkey cost from day one
Know the full cost of your turnkey project right at the start of the design phase — no surprises mid-build.
Unified responsibility
One point of contact across mechanical design, application paperwork, implementation, and reporting — seamless, expedited delivery.
Lifetime warranty on maintenance
Kolostat's exclusive lifetime-guarantee program: a fixed annual price for all maintenance and repair work on your mechanical systems.
A partnership, not a transaction
Recognized for unique expertise in decarbonization through the reengineering of energy systems — engineered for the lifecycle of your equipment.
Sector splits
Equity vs subsidy, by sector
The subsidy shares documented in the guide's four-sector appendix, based on data as of June 1, 2025.
Commercial · 29%
Subsidies on $45.3M of project cost across office, retail, and mixed-use mandates.
Industrial · 38%
Subsidies on $36.6M of project cost across manufacturing and process sites.
Multiresidential · 41%
Subsidies on $22.4M of project cost across multi-family portfolios.
Horticulture · 30%
Subsidies on $43.8M of project cost across greenhouse operations.
The form
Access the guide
Enter your name, company, and work email to open the download page immediately. You can also request follow-up from a senior engineer.








